So with the expanded power plant on the back of the walker I sat and realized that the leg structure probably wouldn't support the weight, so time to upgrade the leg structure.
Additional struts and rotors at all the joints to give in more "strength" and mechanical look to the over all project. Still have the arm strut controls to work out but its moving along.
Monday, July 9, 2012
Subscribe to:
Post Comments (Atom)
Alfrik- looking better and better. How top heavy are these fine fellows?
ReplyDeleteCheers
Ths