Inside of the arm assembly, the shoulder still needs to get drilled out and ready for pin mounting. Green Putty filled in gaps and a quick first paint job applied to see how the overall effect was working out.
The second picture is of the outer side of the arm assembly. Some studs and edging were added as well as a tad of green putty to smooth out the joints.
Looking good.
ReplyDelete